LONDON (Dow Jones)--Balfour Beatty PLC, an infrastructure group, announced Thursday that it has been selected, as part of the Denver Transit Partners or DTP team, to construct the Eagle P3 commuter rail project in the Denver metropolitan area of the U.S.. MAIN FACTS: -As well as Balfour Beatty Rail and Parsons Brinckerhoff, Balfour Beatty's professional services arm, the DTP team includes Ames Construction, Hyundai-Rotem U.S.A, Alternative Concepts, Inc. or ACI, Fluor/HDR Global Design Consultants (FLR), PBS&J, Interfleet Technology, Systra, Wabtec (WAB) and many others. -The DTP venture is led by Fluor Corporation and Macquarie Capital Group Limited. -The DTP team has been selected as preferred bidder by the Denver Regional Transportation District (Denver RTD) and will design, build, finance, operate and maintain the multi-billion dollar Eagle project which includes: -* East Corridor: a new 23.6 mile commuter rail line from Union Station to Denver International Airport; -* Gold Line: a new 11.2 mile commuter rail line from Union Station to Wheat Ridge; -* A two-mile initial segment of the Northwest Rail Corridor; -* Approximately 50 new electric-powered commuter railcars; and -* A new commuter rail maintenance facility. -Once financial close is achieved, Balfour Beatty will be responsible for a 50% share of the engineering, procurement and construction contract and a 33% share of the operations and maintenance contract. -Shares closed Wednesday at 253.10 pence. -By Zechariah Hemans, Dow Jones Newswires; 44-20-7842-9411;
[email protected] (END) Dow Jones Newswires June 17, 2010 02:20 ET (06:20 GMT)